APPLE VALLEY, San Bernardino County — October 26, 2026. Apple Valley’s $9.9 million federal road-safety award could help reshape travel along three central-town corridors, including routes used by people walking, cycling and driving to schools, parks and services. The award was announced in January 2026; it does not mean construction on all three roads is already underway.
Which roads are included?
According to the Town of Apple Valley’s January 15 announcement, the Complete Streets Implementation Project covers approximately 3.4 miles of Dale Evans Parkway, Thunderbird Road and Otoe Road. The corridors include neighborhoods identified in regional analysis as having serious roadway safety concerns and limited transportation options.
How the financing adds up
The town reported a $9.9 million federal Safe Streets for All (SS4A) award from the U.S. Department of Transportation. It described the overall project budget as approximately $12.4 million, including a $2.5 million local contribution from Measure I transportation funds. These figures represent the funding plan described in the announcement, not a verified final construction cost.
What residents may see
Proposed work includes high-visibility pedestrian crossings, protected walking and bicycle facilities, wheelchair-accessible curb ramps, traffic calming and intersection improvements. The goal is to improve connections to schools, recreation, transit, healthcare and workplaces while reducing the risk of serious crashes.
Apple Valley adopted a Complete Streets Action Plan in June 2025 following local studies and engagement. The federal award represents an implementation step in that longer process.
What remains to be confirmed
The town’s announcement did not specify a construction start or completion date. Before describing a particular intersection as closed, redesigned or finished, residents and businesses should check a current council agenda, construction notice or public works update. Any future design changes also need to be checked against the final approved documents.
Primary source: Town of Apple Valley — January 15, 2026 Complete Streets funding announcement. Residents can also use the town’s official meeting and agenda portal to follow project decisions.
Follow Apple Valley News for local infrastructure coverage or browse California58 local newspapers for transportation reporting throughout the state.
Editorial note: The funding announcement is dated January 15, 2026; this October 2026 explainer summarizes that documented award and does not assert the project has been built.
Support Apple Valley News
Choose how to support Apple Valley News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Apple Valley News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Apple Valley News
- Apple Valley November 19 Evening Storm Update: Mountain Roads, Wind and Friday Weather →
- Thanksgiving in Apple Valley: A short outing to Civic Center Park →
- Two Shots During Apple Valley Argument: 46-Year-Old Arrested on Attempted-Murder Suspicion →
- Apple Valley Holiday Craft Fair November 7–8 Brings Dozens of Vendors to Conference Center →
- Apple Valley Veterans BBQ and Car Show Set for November 7 at Singh Center →
СООБЩЕСТВО
Комментарии
Присоединяйтесь к обсуждению California58. Чтобы комментировать, необходимо войти в аккаунт.
Создайте бесплатный аккаунт California58 или войдите через доступную социальную сеть.